December 16, 2008



Some joist close ups.









The joists over the guest room are the only ones not installed yet.









The base layer for the landing between the first and second floors.









Looking from the landing down into the laundry room. The short staircase from the landing to the second floor will cover the opening when they get put in.




The door framing in the central hallway to the suite. The guest room and stairs are to the right and the guest bathroom to the left.




The door framing for the back door.




Looking in the back door from the patio.




The window to the breakfast nook.




The window to the kitchen.




The right window frame in the center front cutout is in. The left window frame is ready for installation.


Return to FenixDome home page.